The Data Center Electrical Audit is aligned with TIA-942 Data Center Standard and aims to evaluate the current and future power requirements and flexibility and scalability in the electrical design and to Investigate the risk factors that can affect the Data Center's availability or cause systems degradation to the potential point of a complete breakdown.
Power distribution
- Electrical design - Review and validation of Electrical Design
- Capacity vs actual utilization
- Electrical Panels (HT/LT) loading & Cable loading study
- Cable Sizes
- Breakers, Capacity, type etc.
- Surge protection
UPS System
- UPS design and load requirements
- Battery Backup & heath check-up
- UPS battery autonomy declaration/calculation
- Etc.
Generators
- Generator fuel capacity declaration/calculation
- ATS panel
- Etc.
Grounding Infrastructure
- Resistance measurement
- Earthing connection scheme
- Cable Sizes
Thermal Imaging
Power Quality along with Harmonics