Data Center Design Consultancy as per TIA942
Preliminary Data Center Design
- Assessment of facility location, need analysis to establish the adequacy of the site
- Estimation of response time, performance, reliability and growth requirements
- Peparation of high-level layouts and drawings in accordance with TIA942 Standard
- Prepare high-level requirement specifications
Data Center Detailed Design
- Design based on requirements as laid out in TIA-942
- Floor layout, Doors, False ceiling etc.
- Electrical Systems Design
- Air-Conditioning, Heating, Ventilation, Air Purification
- Fire Detection and Suppression System
- Surveillance and access control system
RFP / Tender Documents preparation
- Request for Proposal (RFP) documents.
- Bill of Quantities
- Technical Specifications
Monitoring and Assurance
- Periodic review
- Project implementation status & progress
- Corrective measures
- Ensure the quality of the systems / material
- Acceptance testing